The front elevation of the building is constructed with brick which had to be re-pointed. Modern intervention has taken place in a number of areas, where particularly large openings have been made to the front of the building. Problems such as ingress of water resulted in the soft lime mortar being washed out of the brick. The entire front elevation has been retained.
We were employed to carry out a detailed survey of the envelope of this building which incorporated the refurbishment of the old mill and the new build. Many features of the mill were retained and there are now new apartments and houses on this site.
We Project Managed the conservation works during the contract at a massive cost-saving to the Client.
|